Friday, July 29, 2011

Updates

So how is the kitchen coming? Slow, lol. Seriously, it is very slow. Here we are about 2 1/2 months since we demoed it all and we still don't have cupboards, let alone walls. We do have studs. Matter of fact, we have three walls of studs which is a huge improvement.

Next week, we'll hopefully have drywall on the walls. After drywall comes priming, then painting.  After that is cupboards and floors and countertops.  Yay!!! I can see the light at the end of the tunnel.

I never made it to the second hand stores last week. It had been a very hot, very humid week and I didn't care to go anywhere.  Even the pool was warm.

We did get to have a campfire and light sparklers though. The boys enjoyed that.












At the end of the week, we made it to our local, free admission amusement park.






Although it was a hot and humid week, we did enjoy our days as a family.

No comments:

Post a Comment